In situ coal resources, reported according to the requirements of the Canadian National Instrument 43-101:
Project
|
Measured (Mt) |
Indicated (Mt) |
Total M&I (Mt) |
Inferred (Mt) |
| Kendal1 | 8.7 | 0.7 | 9.4 | 25.2 |
| Eloff 2 | 151.1 | 99.2 | 250.3 | 210.5 |
| Grand Total | 159.8 | 100.9 | 260.7 | 235.7 |
| |
| Notes: | 1. At July 31, 2007, as reported by SRK Consulting (South Africa) (Pty) Ltd. |
| | 2. At March 30, 2009, as reported by a Homeland Energy internal technical study |
|
 |  |  | 




|
 |  |